Dariali HPP
Dariali HPP Construction
Dariali Gorge
Tergi River

Dariali Hydroelectric Power Plant

108 MW installed capacity hydroelectric power plant on the Tergi River in the Kazbegi region of Georgia.

108
MW Capacity
500M
kWh Annually
1729
Meters Above Sea Level

Key Project Areas

About Project

Construction and operation of a 108 MW hydroelectric power plant in the Kazbegi region on the Tergi River.

Learn More

Monitoring

Environmental and technical monitoring system throughout the entire project lifecycle.

Learn More

Stakeholders

Project shareholders and partners ensuring the implementation of the $123 million investment.

Learn More

Dariali HPP Project

The project envisages the construction/operation of a 108 MW installed capacity hydroelectric power plant on the Tergi River in the Kazbegi region of northeastern Georgia, at 1729 meters above sea level.

The annual stable output of the HPP is 500 million kWh, of which approximately 70% of energy will be produced during summer months (May-October).

108 MW

Installed Capacity

$123M

Investment

40 Years

Operation Period

110 kV

Transmission Line
Dariali HPP

Clean Energy for Georgia

The hydroelectric power plant collects water flow from the Tergi River and directs it through a derivation tunnel to the main facility.

Photo Gallery

Photo Gallery

Contact Us

Address

Georgia, Tbilisi, Besiki St. #4

Phone

+995 32 2 510 500

Email

info@darialienergy.ge

Message Sent!